![]() At a minimum this inspection shall include the following: 1926.753 (c) (1) (i) (A) All control mechanisms for maladjustments 1926. block or headache ball (lbs) Over Rear (tons) Weight of main block (lbs) Over Front (tons) Weight of lifting beam/bar (lbs) Over Side (tons) Weight of slings and shackles (lbs) Length of Boom (ft) Weight of jib (erected or stowed) (lbs) Weight of hoist rope (extra) (lbs) 5. Cranes being used in steel erection activities shall be visually inspected prior to each shift by a competent person the inspection shall include observation for deficiencies during operation. Additionally you shall be able to select the suitable lifting gear in accordance with the safe working load and weather conditions etc. This lifting plan sample also provides calculation for sling tension. ![]() ![]() Crane Set-Up Area: Concrete/Bitumen/Gravel/Soft/Slope /Other The lifting interest calls for the following to be taken into consideration, be aware this list isn't always exhaustive. Weight of contents (lbs) Rated capacity in tons of crane. Lifting Plan Template Sample for Crane Lift HSE Standard Find below safe work lifting plan template for use in crane lifting process.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |